Canadian Pacific Railway - Boundary Sub

  • Home
  • prototype
  • layout
  • photos
  • operations
  • techniques
Operations tools
Time table

 

schematics

 

paperwork

 

train sheet

 

photographs

A picture says a thousand words, and our picture gallery is full of samples that can help you to understand what we've done. Head to the Photos Page for more information.

photos

 

layout details

The layout is a large double-deck HO scale system based in the late 1950s. Head to the Layout Page for more information.

layout

 

What's New

Our layout is constantly changing, and so is our What's New Page. Keep an eye on it for more information on how we're progressing.

  • what's new

 

 

 

 

 

  • operations time table
  • Our timetable has been developed over several years and is based on the prototype CPR timetables in the late 1950’s to early 1960’s. We have taken a bit of modelers license and included scheduled trains that ran as early as 1958 to add more interest to the sessions. It is designed using Microsoft Excel.


    Recently, our timetable was revised based on the introduction of 8-hour AM and PM shifts and to reflect the reduced fast clock speed to 2.6:1.


    Here is a copy of the current February 2023 version;



  •  

  • Click on the following links to see scanned copies of real employee time tables.

  • CPR Employee Timetable No 94, April 30, 1961; Boundary Subdivision
    CPR Employee Timetable No 113, April 26, 1959; Boundary Subdivision
    CPR Employee Timetable No 110, October 27, 1957; Boundary Subdivision

 

 

 

© Copyright 2024. All rights reserved.